Dell S4248FB-ON Installation Manual
Dell S4248FB-ON Installation Manual

Dell S4248FB-ON Installation Manual

S4200-on series
Hide thumbs Also See for S4248FB-ON:
Table of Contents

Advertisement

S4200-ON Series Installation Guide
December 2017

Advertisement

Table of Contents
loading

Summary of Contents for Dell S4248FB-ON

  • Page 1 S4200-ON Series Installation Guide December 2017...
  • Page 2 A WARNING indicates a potential for property damage, personal injury, or death. Copyright © 2017 Dell Inc. or its subsidiaries. All rights reserved. Dell, EMC, and other trademarks are trademarks of Dell Inc. or its subsidiaries. Other trademarks may be trademarks of their respective owners.
  • Page 3: Table Of Contents

    Contents 1 About this guide............................. 5 Regulatory................................... 5 Related documents................................5 Information Symbols................................6 2 S4200-ON series switch..........................7 Introduction..................................7 Features....................................8 Physical dimensions................................8 LED display..................................8 LED behavior................................9 Prerequisites..................................11 S4200-ON configurations..............................11 Luggage tag..................................11 3 Site preparations............................13 Site selection..................................
  • Page 4 Electromagnetic compatibility ............................45 Emissions..................................45 Immunity..................................45 Safety standards and compliance agency certifications.....................45 Product recycling and disposal............................46 Waste Electrical and Electronic Equipment (WEEE) directive for recovery, recycle, and reuse of IT and telecommunications products..........................46 10 Dell EMC support............................47 Contents...
  • Page 5: About This Guide

    Avoid exposure to laser radiation and do not stare into open apertures. Regulatory • Marketing model S4248FB-ON is represented by the regulatory model E22W and the regulatory Type E22W001. • Marketing model S4248FBL-ON is represented by the regulatory model E22W and the regulatory Type E22W002.
  • Page 6: Information Symbols

    Information Symbols This book uses the following information symbols: NOTE: The Note icon signals important operational information. CAUTION: The Caution icon signals information about situations that could result in equipment damage or loss of data. WARNING: The Warning icon signals information about hardware handling that could result in injury. WARNING: The ESD Warning icon requires that you take electrostatic precautions when handling the device.
  • Page 7: S4200-On Series Switch

    Luggage tag Introduction The S4200-ON Series (S4248FB-ON and S4248FBL-ON) is a one rack unit (RU) compact full-featured high-density 10/25/40/100GbE switch. The switch includes 40 small form-factor pluggable plus (SFP+) optics, six quad form-factor pluggable 28 (QSFP28) optics (100GbE, 4x25GbE, 40GbE, and 4x10GbE), and two QSFP+ optics for 40/100GbE aggregation and 1/10GbE top-of-rack (ToR) and end- of-row (EoR) applications.
  • Page 8: Features

    PSU and fan module Handle: 1.57 inches (40 mm) LED display The S4200-ON Series (S4248FB-ON and S4248FBL-ON) includes LED displays on the I/O side of the switch. For more LED information, see your third-party operating software documentation. S4200-ON series switch...
  • Page 9: Led Behavior

    LED behavior The following S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch LED behavior displays during open networking installation environment (ONIE) operations: Figure 4. S4200-ON Series LEDs System LED Locator LED Link Port LED Activity Port LED QSFP28 Port LED RJ-45 Ethernet Port LED: Left is link; right is activity.
  • Page 10 Description • Blinking blue—Locator function is enabled RJ-45 Ethernet LED • Off—no link and no activity detected • On—Activity on the port • Solid yellow—10MHz activity • Solid green—100MHz activity • Blinking green—1GHz activity Table 2. Management Ethernet port LEDs Description Link LED •...
  • Page 11: Prerequisites

    The S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch has a pull-out tag, known as a luggage tag, on the I/O-side of the switch. The front of the luggage tag includes switch ID information. The back of the luggage tag includes a QRL that takes you to a Dell EMC How-To site where you can watch videos about racking the switch, replacing components, configuring port channels, and so on.
  • Page 12 Figure 5. S4200-ON Series luggage tag SVC Tag MAC Address PPID Express Service Code S4200-ON series switch...
  • Page 13: Site Preparations

    Site preparations The S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch is suitable for installation as part of a common bond network (CBN). You can install the switch in: • Network telecommunication facilities • Data centers • Other locations where the National Electric Code (NEC) applies For more information about switch specifications, see Specifications.
  • Page 14: Rack Mounting

    For more information, see Fans. Power Use the appropriate power cord with the S4200-ON Series (S4248FB-ON and S4248FBL-ON) when connecting the switch to the power source. An AC power cord is included with each PSU. When installing AC or DC switches, follow the requirements of the National Electrical Code ANSI/NFPA 70, where applicable.
  • Page 15: Component Storage

    Component storage If you do not install your S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch and components immediately, properly store the switch and all optional components by following these guidelines: • Storage location temperature must remain constant. The storage range is from -40°C to 70°C (-40°F to 158°F).
  • Page 16: Nebs Compliance

    NEBS-compliant ground installation Before you install the switch into a rack, install the ground (GND) lug assembly. Your switch includes an assembled UL-certified GND lug with bracket, packaged separately. If any parts are missing, contact your Dell EMC sales representative.
  • Page 17 Figure 6. GND lug assembly Remove the two installed M3 screws from the lower-left side of your switch. NOTE: Keep these screws. Remove the bracket assembly from the shipping bag. Clean the bracket and lug surfaces thoroughly and apply an anti-oxidant solution to the mating surfaces. Attach the switch ground using the Ground cable instructions.
  • Page 18 Figure 8. GND lug assembly attached Install your switch into your rack using the Switch installation instructions. NEBS compliance...
  • Page 19: S4200-On Series Installation

    S4200-ON Series installation To install the S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch, complete the installation procedures in the order presented in this section. Always handle the switch and its components with care. Avoid dropping the switch or its field replaceable units (FRUs).
  • Page 20: Rack Or Cabinet Installation

    Do not mount the equipment with the fan panel facing downward. ReadyRails Installation To easily configure your rack for installation of your S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch, use the ReadyRails rack mounting system provided. You can install the ReadyRails system using the 1U tool-less square-hole method or one of three possible 1U threaded round-hole methods —2-post flush mount, 2-post center mount, or 4-post mount.
  • Page 21: Tool-Less Non-Threaded Mount Installation

    Figure 9. Separate rails Tool-less non-threaded mount installation CAUTION: Your switch is not NEBS Earthquake Z4-compliant if you this installation method. NOTE: For more installation instructions, see the installation labels attached to the rail assembly. With the ReadyRails flange ears facing outward, place one rail between the left and right vertical posts. Align and seat the back flange rail pegs in the back vertical post flange.
  • Page 22: Two-Post Flush-Mount Installation

    Figure 10. 1U tool-less nonthreaded square hole installation Align and seat the front flange pegs in the holes on the front side of the vertical post. NOTE: Be sure that the rails click into place and are secure. Repeat this procedure for the second rail. To remove each rail, pull on the latch release on each flange ear and unseat each rail.
  • Page 23: Two-Post Center-Mount Installation

    Figure 11. Two-post center-mount threaded round-hole installation Slide the back bracket towards the post. Secure it with two user-supplied screws, see item 2. Slide the front bracket forward against the front of the vertical post and secure it to the post flange with two user-supplied screws, see item 3.
  • Page 24: Four-Post Threaded Installation

    Figure 12. Two-post center-mount threaded round-hole installation Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, see items 2 and 3. Repeat this procedure for the second rail. Four-post threaded installation NOTE: To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in Step 1.
  • Page 25: S4200-On Series Switch Installation

    For more instructions, see the installation instruction labels on the rail. Attach the inner switch rails to the S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch. Line up the rail with the mounting heads and attach the rail to the switch. Slide the rail back until it locks into place. The following...
  • Page 26 Figure 14. Attach switch rail After installing both switch rails, line them up on the previously mounted ReadyRails and slide the switch in until it is flush with front of rack. To keep the switch from inadvertently sliding out of the rack and falling, about three inches before you fully insert your switch, the rail locking feature engages.
  • Page 27: Ground Cable

    Two threaded holes using one of the two M4 screws. In both configurations, the ground cable is not included. To properly ground the switch, Dell EMC recommends a one- or two-hole lug, M3 or M4 hole size. The ground lugs must be a UL-recognized, crimp-type lug.
  • Page 28: Optics Installation

    The rack installation ears are not a suitable grounding point. Optics installation The S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch has 40 SFP+ optical ports, two QSFP+ optical ports, and six QSFP28 optical ports. For a list of supported optics, see the S4200-ON Series data sheet at www.dell.com/support...
  • Page 29: Power Up Sequence

    (ONIE)-compatible operating system documentation at http://onie.org. For more information about working with the ONIE environment, see your switch documentation at www.dell.com/support. Switch replacement The following steps describe removing and replacing a switch. For further assistance when replacing a switch, contact your Dell EMC support representative. NOTE: ESD damage can occur when components are mishandled.
  • Page 30: Power Supplies

    Power supplies The S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch ships with two AC or DC power supplies. The S4200-ON Series switch supports AC or DC power supplies with two air-flow directions, normal and reverse. Normal is from the I/O to the PSU side.
  • Page 31: Psu Leds

    Figure 16. S4200-ON Series PSUs PSUs The PSUs have an integrated fan, which you cannot replace individually; if the fans integrated in a PSU fail, you must replace the entire PSU. However, you can replace the fan trays individually. For fan tray replacement procedures, see Fans. WARNING: Prevent exposure and contact with hazardous voltages.
  • Page 32: Ac Or Dc Power Supply Replacement

    NOTE: If a PSU fails, you must replace the entire unit. There are no field serviceable components in the PSU. To request a hardware replacement, see Dell EMC support. NOTE: If you use a single PSU, install a blank plate in the other PSU slot. If you are only using one power supply, install the power supply in the first slot, PSU1.
  • Page 33 Figure 18. DC power connector and wiring block DC wire RTN DC power connector Captive screws (2) Orange tab PSU status LED DC power socket DC wire –48V Strip 0.5 inches of insulation from each of the power connector’s wires, RTN and –48V. Insert each of the power connector’s bare wire lengths into the wiring block.
  • Page 34: Fans

    Fans The S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch comes from the factory with two PSUs and five fan modules installed in the switch. The fan modules and the power supplies, which have integrated fans, are hot-swappable. In addition to the power supply modules, you can order and install fan modules separately.
  • Page 35: Fan Leds

    Fan module installation The fan modules in the S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch are field replaceable. There are five fans. Slot 3 is in the middle of the switch and slot 5 is on the right side of the switch.
  • Page 36: Fan Air Filter Replacement

    Fan air filter replacement Environmental factors can decrease the amount of time required between air filter replacements. Check the environmental factors regularly. An increase in temperature and/or particulate matter in the air might affect performance. CAUTION: Check the fan air filters at six-month intervals and replace them as necessary. To accurately determine air filter replacement intervals, regularly monitor the speeds of the cooling fans.
  • Page 37: Management Ports

    • ONIE service discovery RS-232 console port access The RS-232 console port is on the I/O-side of the S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch, as shown. Figure 21. S4200-ON series RS-232 console port CAUTION: Ensure that any equipment attached to the serial port can support the required 115200 baud rate.
  • Page 38: Usb Storage Mount

    Before you install an OS After powering on the S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch, it goes through a power-on self-test (POST). POST runs every time the switch is initialized and checks the hardware components to determine if the switch is fully operational before booting.
  • Page 39: Example Of The Grub Bootloader

    Example of the Grub Bootloader GNU GRUB version 2.02~beta2+e4a1fe391 +-------------------------------------------------+ |*ONIE: Install OS | ONIE: Rescue | ONIE: Uninstall OS | ONIE: Update ONIE | ONIE: Embed ONIE | EDA-DIAG +-------------------------------------------------+ Your switch comes with ONIE installed. NOTE: To access ONIE, use the RJ-45 console port. Example of ONIE ONIE: Install OS For downloading and installing an OS from a URL...
  • Page 40 You can install an operating system manually from HTTP, FTP, or TFTP using the onie-nos-install <URL> command. NOTE: If you have a recovery USB plugged into your switch, remove it before installing the DIAG-OS using the onie-nos- install command. The ONIE Install environment uses DHCP to assign an IP address to the management interface—eth0. If that fails, it uses the default IP address 192.168.3.10/255.255.255.0.
  • Page 41: Specifications

    Specifications This section lists the S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch specifications. CAUTION: Operate the product at an ambient temperature not higher than 113°F—45°C. CAUTION: Lithium Battery Caution: There is a danger of explosion if the battery is incorrectly replaced. Replace only with same or equivalent type of battery.
  • Page 42: Ieee Standards

    600 Watts Start up VDC 39.0 ± 1.5 V Start off VDC 37.5 ± 1.5 v IEEE standards The S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch complies with the following IEEE standards: • 802.1ab (LLDP) • 802.1ax (Layer 2) • 802.1d, 802.1w, 802.1s, 802.1x (Mgmt/Security), 802.3x (Layer 2) •...
  • Page 43: Agency Compliance

    Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits. Dell EMC is not responsible for any radio or television interference caused by using other than recommended cables and connectors or by unauthorized changes or modifications in the equipment.
  • Page 44: Japan Vcci Compliance For Class A Equipment

    (VCCI). If this equipment is used in a domestic environment, radio disturbance may arise. When such trouble occurs, the user may be required to take corrective actions. WARNING: Use the AC power cords with Dell EMC equipment only. Do not use Dell EMC AC power cords with any unauthorized hardware. Figure 24. Japan: warning label Korean certification of compliance Figure 25.
  • Page 45: Electromagnetic Compatibility

    Figure 26. Korean package label Electromagnetic compatibility Emissions • International: CISPR 32 Class A • Australia/New Zealand: AS/NZS CISPR 32, Class A • Canada: ICES-003, Issue-4, Class A • Europe: EN55032, CISPR 32, Class A • EN55032, Class A • Japan: VCCI Class A •...
  • Page 46: Product Recycling And Disposal

    You must recycle or discard this switch according to applicable local and national regulations. Dell EMC encourages owners of information technology (IT) equipment to responsibly recycle their equipment when it is no longer needed. Dell EMC offers a variety of product return programs and services in several countries to assist equipment owners in recycling their IT products.
  • Page 47: Dell Emc Support

    The Dell EMC support site provides integrated, secure access to these services. To access the Dell EMC support site, go to www.dell.com/support/. To display information in your language, scroll down to the bottom of the web page and select your country from the drop-down menu.

This manual is also suitable for:

S4248fbl-on

Table of Contents