Disassembly
4-7-7 Line Feeder Bracket Ass'y
1. Before you disassemble the line feeder bracket
ass'y, you should remove:
– Printer Unit (see page 4-11)
– Feeder Roller Ass'y (see page 4-12)
2. Remove the two screws and take out the LF
bracket ass'y.
4-7-8 Main PBA
1. Before you disassemble the Main PBA, you
should remove:
– Top Cover Ass'y (see page 4-2)
– Rear Cover Ass'y (see page 4-3)
2. Remove the three screws securing the Main PBA.
When you remove the one screw at the bottom,
pull the timing belt.
4-16
LF bracket ass'y
3. Unplug all connectors from the Main PBA.
4. Pull the sensor lever towards you and take out
the Main PBA.
Sensor lever
Main PBA
Timing belt
Samsung Electronics