Battery Installation - BAFANG MAX Drive System Dealer's Manual

Hide thumbs Also See for MAX Drive System:
Table of Contents

Advertisement

5.5

Battery Installation

Insert the battery pack from the tail of the carrier onto the rail. Push it to the front until you hear it snap into place in
the battery pack lock.
Please make sure the battery pack is locked to prevent the battery from becoming detached
while riding.
DEALER MANUAL MAX DRIVE SYSTME
BATTERY (BT C01)
A
battery pack lock
B
battery
44

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents