Ferris FAST-Vac Operator's Manual page 22

Sanapper pro grass collection systems 48” & 52” mower decks
Hide thumbs Also See for FAST-Vac:
Table of Contents

Advertisement

Installation
Install Hose
1. Lower the mower deck to the lowest cutting
position.
2. Install the hose (A, Figure 31) onto the blower
and secure with the removable clamp (with knob)
(B). At least two bands must cover the outlet of
the blower (C).
3. Cut the hose to fit properly between the blower
and collector as shown in Figure 31. At least two
bands must cover the inlet of the collector (D).
Secure with the stationary clamp (E).
A
B
Figure 31. Install Hose
A. Hose
B. Removable Clamp (with knob)
C. Blower Outlet
D. Collector Inlet
E. Stationary Clamp
20
A
C
A
www.ferrismowers.com | www.snapperpro.com
E
D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents