1. Straighten the cable tie on the cable retention bracket. The cable retention
2. Open the cable retention bracket.
Figure 39. Unlocking the cable retention bracket
3. Slide the cable retention bracket away from the power supply unit until there is
4. Attach a power cord to each of the two power supply units in each enclosure.
5. Place the cable retention bracket around the end of the cable that plugs into the
6. Slide the cable retention bracket along the cord until it fits snugly against the
38
Storwize V7000 Unified: Quick Installation Guide
bracket is attached to the power supply unit.
enough room to attach the cable retention bracket to the cable. When sliding
the bracket away from the cable plug-in, pull the lever on the bracket that
controls the cable tie slightly towards the center of the canister. You do not
need to pull the lever to slide the bracket towards the cable plug-in.
Ensure that cables are installed in a tidy manner to reduce the risk of cable
damage when Storwize V7000 Unified replaceable units are removed or
inserted.
power supply unit.