Commissioning - Mira Alero Installation And User Manual

9.8 kw thermostatic electric shower
Table of Contents

Advertisement

Before carrying out the commissioning procedure install the Shower Fittings,
refer to the Shower Fittings Installation and User Guide.
If you are unsure how an electric shower works, please read through the section
"User Instructions" before continuing.
1.
Electrical supply is turned
off at the mains.
4.
Check for water leaks.
7.
Press the 'Start/Stop'
button.

COMMISSIONING

2.
Turn control to full cold.
5.
Set control to 'I'.
8.
0 - 5 Secs
Water will be at full force and
at a cool temperature.
14
3.
Turn the water supply
fully on.
6.
S w i t c h o n e l e c t r i c a l
supply.
9.
Turn the control slowly.
Temperature remains cool
and flow is reduced

Advertisement

Table of Contents
loading

Table of Contents