Commissioning - Mira Platinum Dual Installation Manual

Hide thumbs Also See for Platinum Dual:
Table of Contents

Advertisement

Turn on electrical supply to Digital Mixer Valve.
Make sure the end of the hose is in
either the bath, shower tray or other
water catchment area.
Note! The overhead mounting
will flow water when switched on
2
1
2
("
" or "
") depending on the outlet
plumbing configuration.
1
Press "
" button and reduce
temperature to full cold "CLd".
Turn flow clockwise to full. For
Low Pressure (pumped) version,
let shower run in order to prime
the pump. For long pipe runs, allow
3 - 4 minutes for priming.
Caution! Risk of product damage.
Do not run Pumped Valve (low
pressure version) without a water
supply for longer than 5 minutes
during priming.
1199702-W2-G

COMMISSIONING

2
38

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents