These instructions are to be used in conjunction with the Mira Advance ATL Installation
and User Guide (IUG) to make sure that key installation and operation actions are
followed. Leave these instructions with the user.
Please tick the boxes to confirm the following actions:
1.
Flush a minimum of
2.
10 litres (2 gallons)
through
pipework
prior to connection.
4.
Prime the appliance and fit the
cover (refer to next section).
If you encounter any problems with the operation of this product
please contact Kohler Mira Customer services Department.
1075282-W4-D
Installer Checklist
Isolation valve fitted
3.
Check
and tested for leaks.
BEFORE connecting
electricity.
5.
Set the maximum temperature
and commissioning cycle (refer to
section overleaf).
© Kohler Mira Limited, December 2008
Prime the Unit and Fit the Cover
1.
Connect hose and showerhead,
pointing into bath or tray.
for
leaks
3.
Refit the splash guard and
connect the ribbon cable to the
inside of the cover.
2.
Make sure electricity is isolated!
Push down and hold air bleed
button to prime appliance until
water appears from shower head.
Failure to prime will seriously
affect shower performance!
Carefully dry off water before
connecting/reinstating electricity.
4.
Refit
the
cover.
inserts
provided to finish the cover as
required.
are