Reference Manual
00809-0100-4408, Rev BA
5. Tighten bolts and nuts with sufficient torque for the flange and gasket choice.
6. Connect the air purging system. Refer to
Use thread sealant or suitable gasket according to your site procedures.
7. Align the transmitter head (see
Mechanical Installation
1.0 in. (25.5 mm)
page 142
G
3
/
-in.
8
0.4 in. (10 mm)
page
37).
Mechanical Installation
for air supply specification.
or
November 2017
27