Genie ZX-135/70 with Jib-Extend Operator's Manual page 36

Boom lift
Hide thumbs Also See for ZX-135/70 with Jib-Extend:
Table of Contents

Advertisement

Operator's Manual
Inspections
Test the Operating Envelope
27 Press the LCD screen
control buttons shown until
PRI BOOM ANGLE TO
GRAVITY is displayed.
28 Raise the primary boom and observe the LCD
screen.
Result: The primary boom should raise and the
LCD screen should display the primary boom
angle in degrees.
29 Lower the primary boom.
30 Simultaneously press the
2 LCD screen control
buttons shown to activate
status mode.
31 Press the LCD screen
control buttons shown until
SEC BOOM ANGLE is
displayed.
34
32 Press and hold the secondary boom up/extend
button.
Result: The secondary boom should raise and
the LCD screen should display the secondary
boom angle in degrees.
The secondary boom should raise and then
extend. The secondary boom should not
extend until it is fully raised.
33 Press and hold the secondary boom
down/retract button.
Result: The secondary boom should fully
retract and then lower. The secondary boom
should not lower unless it is fully retracted.
ZX-135/70
Third Edition • First Printing
Part No. 1272823GT

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents