Genie ZX-135/70 with Jib-Extend Operator's Manual page 31

Boom lift
Hide thumbs Also See for ZX-135/70 with Jib-Extend:
Table of Contents

Advertisement

Third Edition • First Printing
Pre-operation Inspection
 Be sure that the operator's, safety and
responsibilities manuals are complete, legible
and in the storage container located in the
platform.
 Be sure that all decals are legible and in place.
See Inspections section.
 Check for hydraulic oil leaks and proper oil
level. Add oil if needed. See Maintenance
section.
 Check for battery fluid leaks and proper fluid
level. Add distilled water if needed. See
Maintenance section.
 Check for engine oil leaks and proper oil level.
Add oil if needed. See Maintenance section.
 Check for engine coolant leaks and proper
level of coolant. Add coolant if needed. See
Maintenance section.
Check the following components or areas for
damage, improperly installed or missing parts and
unauthorized modifications:
 Electrical components, wiring and
electrical cables
 Hydraulic hoses, fittings, cylinders and
manifolds
 Fuel and hydraulic tanks
 Drive and turntable motors and drive hubs
 Wear pads
 Tires and wheels
 Engine and related components
 Limit switches and horn
 Rotation sensors
Part No. 1272823GT
 Platform load cell
 Steer and axle sensors
 Alarms and beacons (if equipped)
 Nuts, bolts and other fasteners
 Platform entry mid-rail or gate
 Lanyard anchorage points
Check entire machine for:
 Cracks in welds or structural components
 Dents or damage to machine
 Excessive rust, corrosion or oxidation
 Be sure that all structural and other critical
components are present and all associated
fasteners and pins are in place and properly
tightened.
 After you complete your inspection, be sure
that all compartment covers are in place and
latched.
ZX-135/70
Operator's Manual
Inspections
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents