Step 5-Installing The Front Panel - Juniper PTX10008 Quick Start Manual

Router chassis
Hide thumbs Also See for PTX10008:
Table of Contents

Advertisement

Step 5–Installing the Front Panel
Copyright © 2017, Juniper Networks, Inc.
You can install the optional cable management kit after the card is installed.
The front panel is required on the PTX10008 to protect fiber optic cabling and to provide
additional protection from electromagnetic interference (EMI). The front panel can be
installed with or without the optional cable management system.
Ensure you have the following tools and parts before you begin:
A Phillips (+) screwdriver, number 2
Front panel (provided with the router chassis)
Right base bracket (provided)
Left base bracket (provided)
2 interchangeable latch brackets (provided)
8 Phillips flat head mounting screws (provided)
To install the front panel:
Remove the plastic bag that is taped to the front panel, which holds the brackets and
1.
screws.
Use the Phillips screwdriver to attach two mounting screws to the left base bracket
2.
at the bottom left side of the chassis frame. The base brackets are larger than the
latch brackets.
NOTE:
The right and left base bracket cannot be interchanged (see
Figure 14 on page
Figure 14: Front Panel Mounting Hardware
3
1—
Latch brackets
2—Right base bracket
17).
1
2
3—
Left base bracket
Step 5–Installing the Front Panel
17

Advertisement

Table of Contents
loading

Table of Contents