AAON RN SERIES Installation Operation & Maintenance page 30

Horizontal packaged rooftop units, heat pumps, & outdoor air handling units
Table of Contents

Advertisement

CAUTION
All roofing work should be performed
by competent roofing contractors to
avoid any possible leakage.
CAUTION
Where the supply or warm air duct
passes through a combustible roof, a
clearance
of
1
maintained
between
edges of the duct and combustible
material in accordance with National
Fire Protection Association Standard
No.
90A.
Provide
enclosure between structure and roof
and all joints must be sealed with
mastic roofing to ensure a watertight
seal.
Be careful to install the provided neoprene
isolator according to the following figure
prior to setting the unit on the curb.
30
inch
must
be
the
outside
flashings
or

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents