Garmin G500 Instructions Manual page 275

Integrated flight display for aquila at01
Hide thumbs Also See for G500:
Table of Contents

Advertisement

2.5.9
Mid-Continent Instruments Attitude Indicator Models 4300-4( ), or 4200-( ) with MD420
If a Mid-Continent Instruments Attitude Indicator is installed as part of the G500/G600 AML STC, the
battery pack must be tested by one of the following means:
1. Manual:
a. Disconnect the battery pack from the Attitude Indicator.
b. Ensure the battery pack is completely charged and at or near room temperature.
c. Connect the battery to a load of 90 ohms (rated for 10 watts) for 60 minutes while
monitoring the battery voltage level.
i. If the battery voltage is at or above 15.0 volts while under load at the end of the
ii. If the battery voltage is below 15.0 volts while under load at the end of the 60
2. Automatic:
a. Use the Mid-Continent Instruments Battery Charger/Tester P/N 36029 to test the
battery.
i. If the time required for discharge is 60 minutes or greater, the battery may be
ii. If the time required for discharge is less than 60 minutes, the battery must be
The battery may be permanently damaged if it is left in a discharged state.
Recharge a discharged battery as soon as possible and
Within the preceding 12 calendar months, proper operation of the attitude instrument must be verified
with the following procedure:
1. Apply aircraft power to the unit and verify that the invalid flag is removed from view and the
STBY PWR indicator is not illuminated.
2. Remove aircraft power from the unit and verify that the invalid flag is not visible and the STBY
PWR indicator is flashing.
3. Press the STBY PWR button and verify that the invalid flag is not visible and the STBY PWR
indicator is not flashing.
4. Press the STBY PWR button a second time and verify that the invalid flag is displayed.
Otherwise maintenance of the Mid-Continent Instruments attitude indicator is 'on condition' only.
2.5.10 Electrical Bonding Test
G500/G600 LRU electrical bonding must be tested every 2000 flight hours or ten (10) years, whichever
is first. During the test, any cables normally attached to the LRU must be disconnected from the LRU. If
measured resistance is greater than applicable values in the following table, bonding must be improved
to meet applicable requirements for a new installation in accordance with section 3.8 of the G500/G600
AML STC Installation Manual.
LRU
GDU 620 – Display Unit
GSU 75(B) – Air Data and Attitude
Heading Reference System
(ADAHRS)
G500/G600 PFD/MFD System
Instructions for Continued Airworthiness
60 minute test, the battery may be recharged in accordance with the
Mid-Continent Instruments Installation Manual and re-installed in the aircraft.
minute test the battery must be replaced.
recharged in accordance with the Mid-Continent Instruments Installation Manual
and re-installed in the aircraft.
replaced.
****WARNING****
maintain with a float charge for maximum battery life.
Metallic Aircraft
40 mΩ (to instrument panel)
20 mΩ (to aircraft ground
plane)
Non-Metallic Aircraft
40 mΩ (to instrument panel)
20 mΩ (to instrument panel)
190-00601-00 Rev. M
Page 6 of 13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G600

Table of Contents