Download Print this page

Travis Industries DVS Insert EF II Owner's Manual page 20

Travis industries owner's manual oil furnace
Hide thumbs Also See for DVS Insert EF II:

Advertisement

Upper Right of Trim
WARNING:
(preferred)
Make sure the heater
is unpluged before
installing the rheostat.
Disconnect the red and brown wires leading to the on/off switch.
a
Insert the wires through the rectangular mounting hole (on the
surround panel or control panel) and attach to the on/off switch.
The wires must attach to the top and bottom posts on one side of
the switch - it does not matter which wire is on top. Press the
switch into the rectangular hole until it locks into place.
Control Panel
(next to gas control valve)
Remove the knob and nut from the rheostat. Insert the
b
shaft on the rheostat through the circular hole (on the
surround panel or control panel). Secure with the nut.
Replace the knob.
Make sure the wires do not contact the burner pan or
c
other hot surfaces (secure with lock ties if necessary).

Advertisement

loading