Chapter 2 Preparations - NEC Express5800/T120d User Manual

Express server express5800 series
Hide thumbs Also See for Express5800/T120d:
Table of Contents

Advertisement

Chapter 2 Preparations

Install the server on the
floor or rigid, flat desk.
A Dust-free, clean, and
organized room
Place having a space enough to fully open the front
door (The front door extrudes about 20 mm from the
right side of the server when fully opened.)
When you have selected a server site, hold the server by its bottom with at least two persons and carry it to
the site, then place it slowly and gently.
The environment that satisfies the following conditions
<Operating>
Ambient temperature:
10°C to 40°C
Humidity:
20% to 80%
Temperature gradient:
±10°C/hour
Air pressure:
749 to 1040 hpa 749 to 1040 hpa
Open stabilizers to secure
the server.
• Do not hold the server by its front bezel to lift the server. The front bezel
Important
may be disengaged and damage the server.
• Open the stabilizers and secure the server to the site.
• Do not hold the handle on the redundant power module when carrying the
server.
Express5800/T120d User's Guide
<Storage>
* It is recommended that the server should
5°C to 40°C
be used in a room where temperature is in
10% to 80%
the range between 15 to 25ºC.
±15°C/hour
At least 150 mm
clearance in front
of/behind the server
Cables for the mouse or
other devices are within
100-VAC bipolar
easy reach.
grounded outlet
2. Installation and Connection
To connect with power outlet
of 200 VAC, use the
separately priced power cord
(K410-162 (03)).
Wall outlet that
can connect with
the power cord.
It is recommended to
install UPS to prevent
momentary voltage
drop due to power
failure or lightning
131

Advertisement

Table of Contents
loading

This manual is also suitable for:

Exp292N8100-1957fN8100-1958fN8100-1959f

Table of Contents