Chapter 2 Hardware Installation; Operating Environment; Free-Standing Ves-1012 Installation Requirements; Rack-Mounted Ves-1012 Installation Requirements - ZyXEL Communications VES-1012 Hardware Installation Manual

Vdsl-ethernet switch
Hide thumbs Also See for VES-1012:
Table of Contents

Advertisement

This chapter shows you how to install hardware for a free-standing or rack-mounted scenario.
2.1

Operating Environment

The following is the recommended environment for the VES-1012.
Operating Environment
Temperature: -5ºC — 60ºC
Humidity: 5% — 95%
Storage Environment
Temperature: -40ºC — 70ºC
Humidity: 20% — 95%
2.2

Free-standing VES-1012 Installation Requirements

Position the VES-1012 on a flat surface. Remember that the unit requires proper ventilation.
2.3

Rack-mounted VES-1012 Installation Requirements

• Two mounting brackets (supplied).
• Eight M3 flat head screws (supplied) and a #2 Philips screwdriver.
• Four M5 flat head screws and a #2 Philips screwdriver.
2.4
Mounting the VES-1012 on a Rack
Precautions:
Make sure the rack will safely support the combined weight of all the equipment it contains.
Make sure the position of the VES-1012 does not make the rack unstable or top-heavy. Take all
necessary precautions to anchor the rack securely before installing the unit.
Hardware Installation
Refer also to the Hardware Specification Appendix.
VES-1012 Hardware Installation Guide
Hardware Installation
Chapter 2
2-1

Advertisement

Table of Contents
loading

Table of Contents