Installation Scenario B - ZyXEL Communications VES-1012 Hardware Installation Manual

Vdsl-ethernet switch
Hide thumbs Also See for VES-1012:
Table of Contents

Advertisement

VES-1012 Hardware Installation Guide
Connect the wiring on the other side of the Telco-50 cable to the upper ports of the MDF using a punch-
Step 3.
down tool.
Connect the telephone wiring from each end-user's VDSL modem to the lower ports of the MDF.
Step 4.
3.4.2

Installation Scenario B

Phone service is available. There is one MDF from which end-users CO connections are made (see next figure).
Please refer to the following figure for the connection schema.
MDF 1 is the original MDF used for telephone connections only.
MDF 2 is used for telephone connections only.
MDF 3 is for VDSL service connections.
Change the wiring from MDF 1 to MDF 3 for telephone subscribers who want VDSL service.
3-4
Figure 3-5 One MDF for End-user and CO Connections
Installation Scenarios

Advertisement

Table of Contents
loading

Table of Contents