Fujitsu AOU48RLXFZ Design & Technical Manual page 277

Hybrid flex inverter system
Table of Contents

Advertisement

Chamber installation
Fit the four-sided holes of the chamber together with the hook fittings of the Fresh Air Intake
Kit (in two places), and secure the attached chamber in place with screws provided.
hook fittings
When using the "UTZ-KXGC" kit for high humidity, please first cut off and remove the heat
insulation as shown in the figure.
Please install the kit for high humidity according to the installation instruction sheet provided.
Cut off
80 (3-5/32)
Ø100 (3-15/16)
30 (1-3/16)
- (06 - 123) -
Unit : mm (inch)
screw x 2
6. SYSTEM DESIGN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents