5.1.4 Equipment required for calibration

The primary source instrument used in the calibration procedures for Fluke 434-II/435-
II/437-II (Series II) is the Fluke 5700A Calibrator. If the required type is not available,
you can substitute another Calibrator as long as it meets the minimum test requirements.

5.2 Calibration Procedure Steps

To do a complete calibration adjustment you must do all following steps:
1. Select the Calibration Mode, section 5.3
2. Do the Contrast Calibration Adjustment, section 5.4
3. Do the Warming Up, section 5.5
4. Do the Final Calibration, section 5.6
5. Save the Calibration Data and Exit the calibration mode, section 5.7

5.3 Starting The Calibration

Follow the steps below to start the calibration:
1. Power the Analyzer via the power adapter input using the BC430 power adapter.
2. With the Analyzer in off position, keep
3. Press
5-4
Power the Analyzer via the BC430 Power Adapter (or any other type that is
recommended by Fluke as suitable).
Fluke 5700A Calibrator.
Stackable safety test leads (4x), as supplied with the Calibrator.
Extra set of test leads capable to withstand 1000 V rms.
Note: for good recognition it is advised to use a black lead between the Calibrator's
LO output and the Analyzer's Ground banana input.
50Ω Coax Cables (3 pieces required): Fluke PM9092 (0.5m, set of 3, 1 set required).
Male BNC to Dual Female BNC adapter: Fluke PM9093 (3 pieces required).
Dual Banana Jack to female to male BNC: Fluke PM9082 (1 piece required).
Power Adapter: BC430.
Analyzer on. A double beep indicates that the Analyzer is has been set to default
settings. Next release
SCREEN
F1
SETUP
, then
Analyzer date. If necessary adjust the date (the calibration date will become the
Analyzer date when saving the calibration data):
Operate
ENTER
Press
to open the SETUP DATE menu.
Operate
SAVE
SCREEN
SAVE
. Use the default position to start calibration adjustment.
F4
and then
- MANUAL SETUP and check the actual
to highlight the Date.
to select in sequence Year, Month, and Day.