Firebox Installation - Jøtul C 350 Winterport Installation And Operating Instructions Manual

Table of Contents

Advertisement

Jøtul C 350 Winterport 138376_Rev_Q 2/17
Installation
1. Remove the existing damper and linkage
components from the fireplace. Alternatively,
you can wire the damper plate to lock it in the
open position. Thoroughly clean the firebox and
smokeshelf area with a wire brush.
2. If the fireplace has been modified to
accommodate installation, use anchors or
masonry nails to attach the metal Fireplace
Conversion Notice Plate (PN 220508) to the back
wall of the masonry fireplace firebox where it will
be readily seen should the insert be removed.
3. Install the Flex Connection plate according to the
manufacturer's instructions. The sealing plate may
require trimming to accommodate your specific
fireplace damper.
Masonry or Listed
HT Prefabricated
Chimney Cap
Damper linkage
removed and
plate is removed
or locked open
Figure 8. Positive Chimney Connection - Canada.
10
Installing the Fireplace Insert
Blower Power Connection
If the optional Flex Conduit Kit 158002 will be
installed, use the instructions included with that kit in
conjunction with those below.
1. Determine to which side the blower power cord
2. Plug the male quick-connector on the end of the
3. Install the inlet coverplate over the inlet opening on
4. Plug the power cord into the receptacle and test the
Sealed
connection to
chimney cap
Attach
Fireplace
Conversion
Notice Plate
to Rear Wall
of Fireplace
will be routed. Insert the AC power receptacle lead
through the appropriate inlet opening in the side of
the firebox. See fig. 9. Remove the #8 x 5/8" pre-
installed phillips screw and engage the receptacle
bracket with the tab in the inlet opening. Reinstall
the screw.
lead into the corresponding female connector on the
blower wire harness.
the other side of the firebox using the pre-installed
sheet metal screw. Fig. 10.
blowers functionality before completing the fireplace
insert installation. See page 16.
DISCONNECT POWER BEFORE COMPLETING FIREBOX
INSTALLATION.
Inlet Tab
Phillips
screw
Figure 9. AC power receptacle lead routing.
Figure 10. Receptacle Inlet Coverplate installation.
Male Quik-connect

Advertisement

Table of Contents
loading

Table of Contents