Step 6.
If you are instructed to return the operator information panel assembly, follow all packaging
instructions, and use any packaging materials for shipping that are supplied to you.
Replacing the operator information panel assembly
Use this information to replace the operator information panel assembly.
To install the operator information panel, complete the following steps:
Step 1.
Read the safety information that begins on "Safety" on page v and "Installation guidelines" on
page 116.
Step 2.
For the eight 2.5-inch hot-swap or simple-swap and ten 2.5-inch hot-swap hard disk drive server
configuration, install the operator information panel assembly into the media cage. For the four
3.5-inch hot-swap or simple-swap hard disk drive server configuration, go to step 4.
Note: Refer to the illustration that applies to your particular server configuration.
Eight 2.5-inch hot-swap or simple-swap hard disk drive server configuration:
Figure 174. Operator information panel assembly installation into media cage for eight 2.5-inch hot-swap or
simple-swap hard disk drive server configuration
Operator information panel
.
Chapter 5
Removing and replacing components
251