Tower Setup - Powerware 9125 Installation Manual

9910 p30
Hide thumbs Also See for 9125:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 7

Tower Setup

The UPS and any optional cabinets (PDM or EBM) must be stabilized with pedestals and/or
joining brackets. The setup varies depending on the number of cabinets you are installing:
®
Powerware
9125 (9910 P30) Installation Guide for IBM
13.
Secure the front of the UPS to the rack using flat-head screws.
14.
Tighten the pan-head screws that secure both rails to the front of the rack (see Step 3
on page 4).
15.
Continue to "Power Cord Connections" on page 12.
1.
For one cabinet,
both sets of pedestals must be installed (provided in the P30
accessory kit). Complete Steps 2 through 4.
For two cabinets,
the pedestals and joining brackets must be installed. Skip to Step 5.
For three or more cabinets,
2.
Place the UPS horizontally, so that the left end of the cabinet is accessible (see
Figure 9).
3.
Slide and position the UPS pedestals over the end of the unit so that the weight of the
cabinet is evenly distributed. Secure the pedestals with the screws provided in the
accessory kit.
Figure 9. Installing Pedestals on a Single Cabinet
4.
Carefully position the unit upright with the air vents at the top (see Figure 10).
Continue to "EBM Installation" on page 10, "PDM Installation" on page 11, or "Power
Cord Connections" on page 12..
Applications S 164201544 Rev A Final 29-Jun-2004
®
Figure 8. Securing the Front of the UPS
skip to Step 8 to install the joining brackets.
P30 Installation Guide
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents