9.3.
Checking of Main P.C.B.
Step 1 Remove Top Cabinet.
Step 2 Remove Main P.C.B..
Step 3 Place Main P.C.B. on the insulated material as shown.
Step 4 Attach 13P Cable at connector (CN1851) on SMPS
P.C.B..
Step 5 Attach 2P Cable at connector (CN2105) on Main P.C.B..
Step 6 Attach 2P Cable at connector (CN2104) on Main P.C.B..
Step 7 Attach 24P FFC at connector (P5002) on Main P.C.B..
Step 8 Attach 10P FFC at connector (P5001) on Main P.C.B..
Step 9 Main P.C.B. can be checked as diagram shown.
30