5.10 Factory wiring diagram
Control circuits
Burner operation may be controlled by either 120V or 24V control
systems.
The required controls must be connected to the burner as de-
scribed on the following.
120V control system
The burner provides it own power supply for the control circuits that
is switched internal from terminal 1(L) & 2 (N), do not apply power
on any other terminal or damaged to the control could occur.
The factory-installed jumper can be removed if a P.O.C device is
desired.
24V control system
If firing is to be controlled by a 24V operating system a 24V switch-
ing relay wired as shown in the diagram is required (not supplied –
sold separately).
The required 24V operating controls must be wired between the
thermostat terminals on the 24V-switching relay.
The factory-installed jumper can be removed if a P.O.C device is
desired.
NOTE:
If an external electrical source is utilized, the conversion burner,
when installed, must be electrically grounded with a solid green
wire to Earth Ground, in accordance with local codes or, in the ab-
sence of local codes, with the National Electrical Code ANSI/NFPA
70-1990 and the CSA Electrical Code.
20062175
Start-up, calibration and operation of the burner
34
WIRING DIAGRAM OF KIT DISPLAY
S8720
Wiring key (Fig. 29)
A1 - Control box for the air/fuel ratio
AZL - Operator panel
XPD- Operator panel connector
GB
Fig. 29