Sec; Introduction; Unpacking - Omega DP25B-S User Manual

Strain gage panel meter
Hide thumbs Also See for DP25B-S:
Table of Contents

Advertisement

1.1 UNPACKING

Remove the Packing List and verify that all equipment has been received. If there are
any questions about the shipment, use the phone numbers listed on the back cover to
contact the Customer Service Department nearest you.
Upon receipt of shipment, inspect the container and equipment for any signs of damage.
Take particular note of any evidence of rough handling in transit. Immediately report any
damage to the shipping agent.
The carrier will not honor any claims unless all shipping material is saved for
Note
their examination. After examining and removing contents, save packing
material and carton in the event reshipment is necessary.
Verify that you receive the following items in the shipping box:
QTY
DESCRIPTION
1
Programmable Digital Meter indicator/controller with all applicable
connectors attached.
1
Owner's Manual
1
Set Mounting brackets
If you ordered any of the available options (except the "BL" Blank Lens
option), they will be shipped in a separate container to avoid any damage to
Note
your indicator/controller.
SECTION 1. INTRODUCTION

Introduction

1
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents