Genie Super Tower ST-20 Operator's Manual page 5

Truss & rigging lift
Hide thumbs Also See for Super Tower ST-20:
Table of Contents

Advertisement

First Edition • Seventh Printing
Avoid debris and uneven surfaces while rolling the
machine with the legs folded up.
Do not replace machine parts critical to stability or
structure with items of different weight or
specification.
Do not cause a horizontal force or side load to the
machine by raising or lowering a fixed or
overhanging load.
Electrocution Hazards
This machine is not electrically insulated and will
not provide protection from contact with or
proximity to electrical current.
Keep away from the
machine if it contacts
energized power lines.
Personnel must not touch
or operate the machine
until power lines are shut
off.
Maintain safe distances away from electrical power
lines and apparatus in accordance with applicable
governmental regulations and the following chart.
Voltage
Phase to Phase
0 to 300V
300V to 50KV
50KV to 200KV
200KV to 350KV
350KV to 500KV
500KV to 750KV
750KV to 1000KV
Allow for mast movement and electrical line sway
or sag, and be aware of strong or gusty winds.
Do not use the machine as a ground for welding.
Part No. 32950
Crushing Hazards
Do not release the winch handles until the brake is
locked. The brake is locked when the load will not
cause the winch handles to turn.
Do not raise unless the load center (balance point)
is properly positioned between the carriage and the
end of the adjustable forks.
Do not stand under or
allow personnel under
the machine when the
load is raised.
Do not stand under the
load. The safety brake
system will allow the
load to drop 1 to 3 feet
before locking the
columns.
Do not raise unless the load is properly secured to
the forks.
Do not lower the load unless the area below is clear
of personnel and obstructions.
Keep hands and fingers away
from any potential pinch points.
Do not raise the load unless the
Minimum Safe
Approach Distance
snap pins are properly inserted in
the forks.
Feet
Meters
Avoid Contact
10
3.1
15
4.6
20
6.1
25
7.6
35
10.7
45
13.7
Genie Super Tower
Operator's Manual
SAFETY RULES
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Super tower st-25

Table of Contents