Genie Super Tower ST-20 Operator's Manual page 12

Truss & rigging lift
Hide thumbs Also See for Super Tower ST-20:
Table of Contents

Advertisement

Operator's Manual
FUNCTION TESTS
Function Tests
1 Position the machine at the desired work site.
Setup
1 Remove the outriggers from the outrigger
storage sockets.
2 Lay each outrigger near the base where it is to
be installed. The two long outriggers will be
installed into the two front base sockets. The
two short outriggers will be installed into the two
rear base sockets.
3 Select any outrigger. Slide the outrigger all the
way into the base socket until the outrigger lock
pin snaps into the outrigger, locking it in place.
Repeat for each remaining outrigger.
4 Adjust the outrigger screw jacks until the base
casters are slightly off the ground.
5 Level the machine with the outrigger screw jacks
by referencing the bubble level located on the
base. Level the machine using only the
outriggers.
10
Load Handling Attachment
Adjustable Forks
1 Place the forks inside the carriage.
2 Insert the retaining pin.
3 Adjust the forks to the desired width and be sure
the snap pins are properly inserted in each fork.
Genie Super Tower
First Edition • Seventh Printing
Part No. 32950

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Super tower st-25

Table of Contents