HP HPE XP P9500 Manual page 44

Hide thumbs Also See for HPE XP P9500:
Table of Contents

Advertisement

Figure 15 Service clearances for a six rack system
*1 Clearance (a+b) is based on the floor load rating and the clearance (c). Floor load rating and
required clearances are shown in
*2 Clearance (d) is required over 300mm to open the front door. In the case that the clearance
(d) is less tan the clearance (a), give priority to clearance (a).
Table 24 Floor load rating and required clearances for a six rack configuration
Floor Load
Rating
(kg/m2)
500
450
44
Installation requirements
Table 24 (page
Required Clearance (a+b) m
Clearance (c) m
C=0
C=0.2
0.1
0
0.7
0.4
44).
C=0.4
C=0.6
0
0
0.1
0
C=0.6
0
0