Figure 13 Service clearances for a four rack system (right module)
*1 Clearance (a+b) is based on the floor load rating and the clearance (c). Floor load rating and
required clearances are shown in
*2 Clearance (d) is required over 300mm to open the front door. In the case that the clearance
(d) is less tan the clearance (a), give priority to clearance (a).
*3 Clearance (e) is required over 200mm to open the rear door. If clearance (e) is less than
clearance (b), give priority to clearance (b).
Table 22 Floor load rating and required clearances for a four rack configuration (right
module)
Floor Load
Rating
(kg/m2)
500
450
400
350
40
Installation requirements
Table 22 (page
Required Clearance (a+b) m
Clearance (c) m
C=0
C=0.2
0.1
0
0.5
0.3
1.1
0.8
1.8
1.5
40).
C=0.4
C=0.6
0
0
0.1
0
0.6
0.4
1.2
1.0
C=0.6
0
0
0 .1
0.6