HP HPE XP P9500 Manual page 34

Hide thumbs Also See for HPE XP P9500:
Table of Contents

Advertisement

Figure 9 Service clearances for a two rack system (two DKC)
*1 Clearance (a+b) is based on the floor load rating and the clearance (c). Floor load rating and
required clearances are shown in
*2 Clearance (d) is required over 300mm to open the front door. In the case that the clearance
(d) is less tan the clearance (a), give priority to clearance (a).
*3 Clearance (e) is required over 200mm to open the rear door. If clearance (e) is less than
clearance (b), give priority to clearance (b).
Table 18 Floor load rating and required clearances for a two rack configuration (two DKC)
Floor Load
Rating
(kg/m2)
500
450
400
34
Installation requirements
Table 18 (page
Required Clearance (a+b) m
Clearance (c) m
C=0
C=0.2
0.1
0
0.3
0.2
0.5
0.4
34).
C=0.4
C=0.6
0
0
0.1
0
0.3
0.2
C=0.6
0
0
0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents