Figure 11 Service clearances for a three rack system (right module)
*1 Clearance (a+b) is based on the floor load rating and the clearance (c). Floor load rating and
required clearances are shown in
*2 Clearance (d) is required over 300mm to open the front door. In the case that the clearance
(d) is less tan the clearance (a), give priority to clearance (a).
*3 Clearance (e) is required over 200mm to open the rear door. If clearance (e) is less than
clearance (b), give priority to clearance (b).
Table 20 Floor load rating and required clearances for a three rack configuration (right
module)
Floor Load
Required Clearance (a+b) m
Rating
Clearance (c) m
(kg/m2)
C=0
500
0.1
450
0.4
400
0.8
350
1.4
Table 20 (page
37).
C=0.2
C=0.4
0
0
0.3
0.1
0.6
0.5
1.2
1.0
Service clearance, floor cutout, and floor load rating
C=0.6
C=0.6
0
0
0
0
0.3
0 .1
0.8
0.5
37