5. Reinstall the right battery retention bracket:
6. Reinstall the left battery retention bracket:
7. To attach the UPS lower front bezel, press the two side latches toward each
24
11000 VA UPS and 11000 VA EBM: Installation and Maintenance Guide
a. Slide the right battery retention bracket to the left and into the slot 1 .
R
b. Rotate the battery retention bracket toward the UPS 2 . Make sure that the
internal battery connectors are out of the way.
c. Slide the battery retention bracket to the right 3 and tighten the
thumbscrew on the right battery retention bracket 4 .
a. Slide the left battery retention bracket to the right and into the slot 1 .
L
b. Rotate the battery retention bracket toward the UPS 2 . Make sure that the
internal battery connectors are out of the way.
c. Slide the battery retention bracket to the left 3 and tighten the thumbscrew
on the left battery retention bracket 4 .
other, align the bezel underneath the upper bezel, and snap it into place.