Electrical Supply - GE ZBD4800XBB Installation Instructions Manual

Table of Contents

Advertisement

Electrical
Supply
Electrical Requirements
• This appliance must be supplied with 120V,
• Wiring must be 2 wire with ground.
• If the electrical supply provided does not
• A side-by-side dual installation requires two
Grounding Instruction
This appliance must be connected to a
ground metal, permanent wiring system, or an
equipment-grounding terminal or lead on the
appliance.
CAUTION
WARNING
Warning, for
Personal Safety:
Remove house
fuse or open
circuit breaker
before beginning installa-
tion.
Do not use an extension
cord or adapter plug with
this appliance. Follow
National electrical codes
or prevailing local codes
and ordinances.
60 Hz., and connected to an individual,
properly grounded branch circuit, protected
by a 15 or 20 ampere circuit breaker or time
delay fuse.
meet the above requirements, call a licensed
electrician before proceeding.
separate circuits.
CAUTION
WARNING
Warning: The improper connec-
tion of the equipment-grounding
conductor can result in a risk of
electric shock. Check with a
qualified electrician or service
representative if you are in doubt whether
the appliance is properly grounded.
Installation Preparation
Stainless Steel Interior Dishwashers
18"
1-1/2" Dia. Hole (Max.)
Receptacle
Location
18"
Area
6"
6"
Cabinet Preparation & Wire Routing
• Wiring may enter from either side of the
opening, from the rear, or from the floor
within the shaded area shown.
• Cut hole 1-1/2" max. dia. within the shaded
area to admit the electrical cable or power
cord. The hole must be free of sharp edges. If
the cabinet wall partition is metal, the edge
of the hole must be covered with a rubber
cord protector.
Electrical Connections to Dishwasher
• For cable direct connections the cable must
be routed as shown in the diagram. Cable
must extend a minimum of 24" from the rear
wall.
• For power cord connections, install a 3-prong
grounding type receptacle in the rear wall of
sink cabinet next to the dishwasher. The
receptacle should be installed at least
6", but not more than 18", from the cabinet
opening for dishwasher. Power cord must be
no longer than 6 feet from the junction box
to the plug.
Alternate
Receptacle
Location
1-3/4"
3"
from
6"
Cabinet
24"
from Wall
Ground
Black (Live)
White (Neutral)
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zbd4800xwwZbd4700xbbZbd4700xwwZbd4600xbbZbd4600xww

Table of Contents