Hot Water Supply - GE ZBD4800XBB Installation Instructions Manual

Table of Contents

Advertisement

Hot Water
Supply
The hot water supply
line may enter from
either side, the rear
or from the floor
within the shaded
area.
• Turn off the water supply.
• Cut a hole approximately 1-1/2" dia. within
• Install a hand shut-off valve in the hot water
the shaded area to admit the water line.
Access holes must be round and smooth.
supply line in an accessible location, such as
under the sink. (The shut-off valve is op-
tional, but recommended and may be
required in some local codes.)
Installation Preparation
1-1/2" Dia.
Hole
Shut-off
Valve
Hot
Left
Side Entry
Approx. 30"
Cabinet Face
from Wall
• Install the hot water inlet line, using no less
than 3/8" O.D. copper tubing or 1/2" O.D.
plastic tubing.
• The water line must be long enough to form
a smooth natural loop with no sharp bends
or kinks between the cutout entry and fill
valve location. For a left side entry, allow
approximately 30" length. For a right side
entry, allow approximately 40" length.
• Extend the water line forward to approxi-
mate fill valve location.
• Adjust the water heater to deliver 120°F min.
water temperature.
• The water pressure of the hot water supply
line must be 20 to 120 psi.
Stainless Steel Interior Dishwashers
1-3/4"
6"
Right Side Entry
Approx. 40" from Wall
2" from Floor
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zbd4800xwwZbd4700xbbZbd4700xwwZbd4600xbbZbd4600xww

Table of Contents