Acbi Chimney; Installation Instructions - Superior WRT4826WH Installation And Operation Instructions Manual

Wood burning fireplaces
Table of Contents

Advertisement

ACBI
Chimney Outside Air Intake
(required when using ACBI
chimney)
Outside Air Kit
(Mandatory)
Figure 22
CHIMNEY INSTALLATION INSTRUCTIONS
1. Cut and frame the holes in the ceiling, fl oor
and roof where the chimney will pass (see
Figure 23). Use a plumb-bob to line up the
center of the holes. The sizes are indicated in
Table 1 for the wall and ceiling holes and Table
2 (Page 20) for the roof holes.
NOTE: ACBI
*
chimney require 1" clearance
going through ceiling and roof and 2" clear-
ance through a wall. ASHT+
*
chimney require
2" clearance. Do Not fi ll this air space with
insulation or any combustible material.
CHIMNEY INSTALLATION
*
CHIMNEY MODEL
ASHT+ *
DuraTech DTC **
S2100+ * :
ACBI * : Ceiling
(1" clearance)
ACBI * : Wall
NOTE: See Table 2 for Sloped Roof Framing
Table 1 - Flat Roof Framing
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
Flashing
Attic Radiation
Shield
Firestop
Starter
Section
SQUARE HOLE
SIZE OPENING
13-3/8" (340 mm)
13-3/8" (340 mm)
15-1/8" (384 mm)
15" (381 mm)
17" (432 mm)
Figure 23
2. From below, install a fi restop in each ceiling/
fl oor separation through which the chimney
will pass. At the attic level, install an attic
radiation shield from above, (see Figure 24).
S2100+
*
and ASHT+
*
: Place the fi rst chimney
length on the fi replace, to lock turn 1/4 of a
turn clockwise. ACB
*
I: A starter section must
be installed before installing the fi rst chimney
length (see Figure 22).
3. ACBI
*
: Every 20 feet and at the roof level,
install a universal support fastening the straps to
the surrounding joists. ASHT+
*
: Install support
as required (see Chimney Support Installation
Section on Page 22).
4. Put the roof fl ashing in place and seal the joint
between the roof and the fl ashing with roofi ng
pitch (see Figures 25 and 26). For sloping roofs,
place the fl ashing under the upper shingles and
on top of the lower shingles. Nail the fl ashing
to the roof, using roofi ng nails.
5. Place the storm collar over the fl ashing and
tighten it with the bolt supplied. Finally, seal the
joint between the storm collar and the chimney,
using silicone caulking.
6. Install the chimney cap. Once the chimney
cap is in place, the roof fl ashing can be washed
with a solvent or vinegar and then painted with
rust-proof paint.
Figure 24
*
Available from Security Chimneys™
**
Available from DuraVent
ATTIC
RADIATION
SHIELD
FIRESTOP
19
®

Advertisement

Table of Contents
loading

Table of Contents