Follett Horizon Elite HMD1410N Operation And Service Manual page 25

Remote condensing
Hide thumbs Also See for Horizon Elite HMD1410N:
Table of Contents

Advertisement

22. Install shuttle switch.
§ Align holes with pins (Fig. 23.1) and depress switch
button (Fig. 23.2) to clear shuttle tab.
23. Install shuttle drain tube and front feed water tube
(Fig. 24) .
24. Install main housing insulation and shuttle insulation:
25. Apply a coat of petro gel to auger shaft.
HCD1010A/W, HCD1010A/W, HCD1410A/W, HCD1410A/W
Fig. 23
Fig. 24
Fig. 25
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents