1
About this document
Target audience
Product Manager (PM)
Project Manager
Installer
Commissioning personnel
Maintenance personnel
Building Technologies
Fire Safety & Security Systems
Goal and purpose
This document describes the radio gateway FDCW221 as well as the integration of
the radio detectors DOW1171 and SMF6120 into the fire detection system.
It contains all information on the setup and functions as well as project planning,
installation and commissioning.
Target audience
The information in this document is intended for the following target groups.
Activity
Performs local product management.
–
Is responsible for the exchange of
–
information between the headquarters
and his RC for his products.
The Project Manager is responsible for
–
the local project management.
Coordinates the use of all persons and
resources involved in the project
according to schedule.
Continuously supplies information
–
necessary for project realization.
Assembles and installs the components
–
at the place of installation.
Performs a subsequent check of the
–
installation.
Configure the product at the place of
–
installation according to customer-
specific requirements.
Check the product operability and
–
release the product for use by the
operator.
Search for and correct malfunctions.
–
Carry out all maintenance work and
–
check for correct functioning.
About this document
Qualification
Has suitable specialist training for the
–
function and for the product range.
Has attended the PM training courses.
–
Has suitable specialist training for the
–
function, project scale and product
range.
Has attended the Project Manager
–
training courses.
The personnel have received
–
specialist training in the area of
building installation technology or
electrical installations.
Has suitable specialist training for the
–
function and for the product range.
Have attended the training courses for
–
commissioning personnel.
Has suitable specialist training for the
–
function and for the product range.
009865_b_en_--.doc
5
11.2007