Prepare Boiler - Freestyle 80 Manual

Wall mount gas-fired condensing boilers
Hide thumbs Also See for 80:
Table of Contents

Advertisement

®
W
FreeStyle
ALL
2 Prepare boiler location
Air contamination
air contamination problems.
See Table 1
combustion air.
Table 1
Corrosive contaminants and likely location
8
M
-
OUNT GAS
FIRED WATER BOILER
Boiler Manual
continued
described in this manual.
-
The air termination fitting must be installed with
the clearances and geometry relative to the vent
outlet depicted in this manual to ensure that flue
products do not enter the air intake.
Ensure that the combustion air will not contain
nants.
Contaminated combustion air will damage the
boiler, resulting in possible severe personal injury,
death or substantial property damage.

3 Prepare boiler

Remove boiler from crate
The boiler is heavy
Do not drop boiler or bump jacket on floor or pallet.
Damage to boiler can result.
tion, handle with care until the plastic components
come to room temperature.
1.
removing the shipping container.
2.
and bottom cardboard cap, until ready to place on the wall.
mounting and comes standard with a hanging
bracket. The wall fixture must ensure stable and
.
FreeStyle® boiler as
. Use caution not to drop the
Part number 550-142-850/0716
-
-
-

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

155120

Table of Contents