Main Ac Wiring; Battery Requirements; Battery Installation - Generac Power Systems rtg16eza1 Owner's Manual

Automatic transfer switch
Hide thumbs Also See for rtg16eza1:
Table of Contents

Advertisement

Section 6: Electrical Connections

Main AC Wiring

NOTE: Main AC wiring must be in accordance with local
jurisdiction and codes.
Strip the insulation off the wire ends. Do not
1.
remove excessive insulation.
Remove the two cap plugs located behind the
2.
breaker door and to the right of the Main Breaker.
Loosen the lugs of the Main Breaker through the
3.
access holes.
Insert a power wire (E1 or E2) through the opening
4.
in the back cover and into the bottom lug. Torque to
the proper specification.
NOTE: There are 3 screws inside the top of the breaker
panel (behind the breaker door). Removing these screws
will allow the entire breaker box to be carefully pulled out.
When reinstalling, be certain that the tabs on the bottom
lock into place.
Connect the Neutral wire to the Neutral Lug if
5.
applicable. Torque to the required specification.
See
Table 6-2.
Connect the Ground wire to the Ground Lug and
6.
torque to the required specification. See
NOTE: Neutral Bonding - For installations that require
the neutral to be bonded to the ground, this is to be done
on the customer connections terminals inside the
generator. Connect a suitably sized wire from the neutral
bar to the ground bar. This is normally required when the
generator is the source in a separately derived system. It
is not required when the generator is a backup source in
a utility supplied electrical system with a 2-pole transfer
switch. See
Figure
6-1.
NOTE: Torque all wiring lugs, bus bars and connection
points to the proper torque specifications. Torque
specifications for the Main Line Circuit Breaker (MLCB)
can be found on a decal located on the inside of the Main
Line Circuit Breaker Door.

Battery Requirements

Group 26R, 12V, 540CCA (Minimum CCA)

Battery Installation

WARNING
24
Fill the battery with the proper electrolyte fluid if
necessary and have the battery fully charged before
installing it.
Before installing and connecting the battery, complete the
following steps:
Verify that the generator has been turned OFF.
1.
Turn off utility power supply to the transfer switch.
2.
Remove the 7.5A fuse from the generator control
3.
panel.
Battery cables were factory connected at the generator.
See
Figure
follows:
Explosion. Batteries emit explosive gases.
Always connect positive battery cable first to
Table
6-2.
avoid spark. Failure to do so could result in
death or serious injury.
Connect the red battery cable (from starter
4.
contactor) to the battery post indicated by a
positive, POS or (+).
Connect the black battery cable (from frame
5.
ground) to the battery post indicated by a negative,
NEG or (-).
Install the red battery post cover (included).
6.
NOTE: Dielectric grease should be used on battery
posts to aid in the prevention of corrosion.
NOTE: Damage will result if battery connections are
made in reverse.
(000137a)
A. Negative (-) Black lead from frame
B. Positive (+) Red lead from starter contactor
Figure 6-2. Battery Cable Connections
Installation Guidelines For 60 Hz Air-cooled Generators
WARNING
6-2. Connect cables to battery posts as
WARNING
B
A
+
-
000621
(000138a)
(000133)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rtg12eza1Rtg10eza1

Table of Contents