Boiler installation
3. Slide the insertion tabs of the control into the oval
openings.
4. Slide control toward the boiler front panel.
5. Push to snap plastic tabs of the control into the
knock-outs.
6. Remove top cover of control Remove screws from
the top cover.
7. Fasten control with sheet-metal screws.
8. Route boiler water sensor cable through the cable
opening and unroll to the required length.
18
Installation and maintenance instructions Logano G124X II/SP special gas-fired boiler • Issue 04/2005
Fig. 14 Removing terminal cover
Fig. 15 Installation of Logamatic 2000 control system
1 Screws