Pre-Commissioning Checks - Appliance - Worcester Greenstar Heatslave 12/18 Instruction Manual

Floor standing oil fired condensing combination boiler
Hide thumbs Also See for Greenstar Heatslave 12/18:
Table of Contents

Advertisement

8 716 106 252f
30/3/10
12:56
1
12/18 & 18/25
0.6
0.5
0.4
Bar
0.3
0.2
0.1
0
0
200
400
0.7
0.6
0.5
Bar
0.4
0.3
0.2
0.1
0
0
200
400
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE 12/18-18/25-25/32
8 716 106 252f (03/2010)
Page 29
600
800
1000 1200 1400 1600
Litres per hour
25/32
600
800
1000 1200 1400 1600 1800
2000 2200 2400
Litres per hour
PRE-COMMISSIONING CHECKS -
2
APPLIANCE
CAUTION: ISOLATE THE MAINS SUPPLIES
3
BEFORE STARTING ANY WORK AND
OBSERVE ALL RELEVANT SAFETY
PRECAUTIONS.
1 Check that the service and water pipes are
connected correctly.
Check that all unused sockets are capped.
2
Check that the oil supply is kerosene and
that the pipework is connected correctly to
the oil pump via the supplied flexible oil
hose.
Turn on the main oil supply valve at the
tank, check the oil supply pipework and
connections. Rectify any leaks.
NOTE: Replace flexible hose at annual
service to prevent possible oil leakage.
3
Check the flue is correctly fitted and the
connections are secure.
4
Check the condensate pipework is
correctly fitted and connected.
Check the condensate trap is filled with
water.
4
5
Check the CH circulating pump is set to 3.
NOTE: The CH circulating pump is preset to
number 3 and should not be altered.
The diagrams opposite show the pump
outputs.
5
IMPORTANT: If the boiler is not to be
commissioned immediately then:
After successfully completing all of the
checks and any rectification work, close the
water valves, shut off the oil supply and
electrically isolate the boiler.
Complete the installation part of the
Guarantee Registration Card, and complete
a CD10 or equivalent to inform the LABC of
the installation.
PRE-COMMISSIONING CHECKS -
29
APPLIANCE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar heatslave 25/32Greenstar heatslave 18/25

Table of Contents