Refitting Components - Worcester Greenstar Heatslave 12/18 Instruction Manual

Floor standing oil fired condensing combination boiler
Hide thumbs Also See for Greenstar Heatslave 12/18:
Table of Contents

Advertisement

8 716 106 252f
30/3/10
12:56
E
F
H
G
3
2
E
26

REFITTING COMPONENTS

Page 26
B
A
C
D
4
1
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE 12/18-18/25-25/32
REFITTING COMPONENTS
1
1
Align burner combustion head (A) into boiler
housing tube with gasket (B) correctly fitted.
Push firmly down to compress the gasket (B).
Tighten burner retainers (C) sufficiently to
ensure a good seal.
IMPORTANT: Ensure the gasket is a good
seal between the burner combustion head
and the boiler housing to prevent flue gases
escaping from the combustion chamber
into the room.
Attach air duct and tighten clip (D) to
secure to the burner air intake.
2
Refit the expansion vessel (E) onto the
support bracket (F) taking care not to kink
the flexible hose or snag the thermostat
capillaries.
3
Plug burner lead (G) into control box (H).
4
Press in the lugs ( I ), pivot the control box
(H) down and slide into the boiler casing.
B
I
8 716 106 252f (03/2010)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar heatslave 25/32Greenstar heatslave 18/25

Table of Contents