Pipework Connections - Worcester Greenstar Heatslave 12/18 Instruction Manual

Floor standing oil fired condensing combination boiler
Hide thumbs Also See for Greenstar Heatslave 12/18:
Table of Contents

Advertisement

8 716 106 252f
30/3/10
12:56
CAUTION: ISOLATE THE OIL & WATER MAINS SUPPLY BEFORE STARTING ANY WORK
AND OBSERVE ALL RELEVANT SAFETY PRECAUTIONS.
Q
S
T
24

PIPEWORK CONNECTIONS

Page 24
F
P
G
O
500ml
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE 12/18-18/25-25/32
PIPEWORK CONNECTIONS
A -
B -
C -
D -
E -
F -
G -
H -
J -
K -
L -
M -
N -
O -
P -
WATER CONNECTIONS:
Remove the transit bungs from the pipework
connections on the boiler.
NOTE: That surplus water may be present
Remove the central heating flow pipe (A)
from its packaging. Grease the flat washer
with the grease supplied and fit the pipe and
washer onto the isolation valve as shown.
Ensure all pipework is clean.
Align water pipework and connect, ensuring
that the expansion tank and control box fit
correctly before permanently connecting the
H
pipework.
N
Check that all unused sockets have been
J
capped.
OIL SUPPLY CONNECTIONS:
Route the oil supply pipe (E) along either side
K
of the boiler as required and connect to the
isolating valve (F) and ensure the valve is closed.
*NOTE: Replace flexible hose at annual
service to prevent possible oil leakage.
Connect the flexible oil hose (G) to the
isolating valve (F).
CONDENSATE CONNECTION:
Connect 21.5mm polypropylene pipe (K) (not
supplied) to the condensate waste pipe
flexible push fit connector (J) and terminate to
waste.
E
Do not use any solvents, adhesives or
L
lubricants when pushing the pipe into the
rubber connector (J).
Ensure that the condensate pipe runs away
from the boiler at a constant fall of 50mm
(min.) for every metre.
1m
Seal all condensate pipe joints.
Carefully pour 500ml of water into the
condensate collection ( T ) to fill condensate trap.
50mm (min.)
Check the water is running away and the
condensate pipework joints are water tight.
K
Check the flue manifold seal is undamaged
and seated correctly.
Refit flue manifold access cover (S) and
secure with screws (Q).
IMPORTANT: The condensate trap must be
correctly filled to prevent the possibility of
potentially harmful flue products escaping
via the condensate pipework.
PRESSURE RELIEF CONNECTION:
Connect the pressure relief pipe (M) to a
copper discharge pipe (15mmØ min.).
CH flow 22mmØ copper (28mmØ on
25/32 models)
DHW flow 22mmØ
DHW water main inlet 15mmØ
CH return 22mmØ copper (28mmØ on
25/32 models)
10mmØ oil supply connection
Oil isolating valve (10mmØ)
Flexible oil hose*
Flue manifold condensate outlet
Condensate outlet and flexible push fit
connect (21.5mmØ) -
supplied
Condensate pipe - not supplied
Condensate trap with wall clamp -
supplied
Pressure relief (15mmØ)
Optional combined feed and expansion
and open vent 1" BSP
Drain
Fixing point for optional return oil pipe
due to factory testing.
8 716 106 252f (03/2010)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar heatslave 25/32Greenstar heatslave 18/25

Table of Contents