Installing The Sfp Transceiver - Planet gsd-1002vhp User Manual

Table of Contents

Advertisement

Step 5: After the brackets are attached to the 802.3at PoE+ Switch, use suitable
screws to securely attach the brackets to the rack, as shown in Figure
3-3.
Figure 3-3: Mounting the 802.3at PoE+ Switch in a Rack
Step 6: Proceed with Steps 4 and 5 of session 3.1 Desktop Installation to
connect the network cabling and supply power to your Switch.

3.3 Installing the SFP Transceiver

The sections describe how to insert an SFP transceiver into an SFP slot of the
802.3at PoE+ Switch.
The SFP transceivers are hot-pluggable and hot-swappable. You can plug in and
out the transceiver to/from any SFP port without having to power down the
802.3at PoE+ Switch, as the Figure 3-4 shows.
22
24 -P or
t 10 /1 00
SF P Et he
/1 00 0T
rn et Sw
80 2. 3a
itc h
t Po E
+ 2- Po
rt G ig ab
2
it
4
PoE Port
PoE
6
8
10
Statu s
12
14
2
16
18
4
20
22
1
24
6
PWR
3
PoE
5
7
8
9
11
13
10
15
SFP
1000
17
19
21
10/1 00
LNK
23
LNK
ACT
25
26
LNK
PoE In-U
ACT
ACT
se
Stan dard
VLAN
Exten d
1
3
5
7
9
Figure 3-4: Plug In the SFP Transceiver
12
14
16
18
20
22
24
GS W -26
11
20 VH P
13
15
SFP
17
19
21
23
25
26
1
MGB-Series Module
2
LC Fiber Cable

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsw-2620vhpGsw-1820vhp

Table of Contents