How To Install; Unpacking The Air Conditioner; Preparing The Air Conditioner - Haier HWE15XCR-L User & Care Manual

Table of Contents

Advertisement

Available languages

Available languages

UNPACKING THE AIR CONDITIONER

When moving or lifting the air conditioner, use two or more people.
Wear gloves when handling the air conditioner to protect against
REMOVE PACKAGING MATERIALS
Remove packaging materials. Save the carton and the foam packaging for storing the unit when
not in use.
NOTE:
open the cabinet.
Handle the air conditioner gently.
Keep the air conditioner upright and level. Do not set the air conditioner on its side, front, back
or upside down.
The air conditioner must be standing upright for 2 hours prior to installation and operation.

PREPARING THE AIR CONDITIONER

Unpack unit in the floor near the installation location
cabinet from the front panel. (See Fig.6)
basepan handle, slowly and evenly pull out the chassis from the cabinet. Use two or more
people to move the air conditioner.
WARNING
EXCESSIVE WEIGHT HAZARD
possible sharp edges and metal fins.
Fig. 6
B

HOW TO INSTALL

B
A
B
PAGE 11

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Hwe24vcr-lHwe18vcr-l

Table of Contents