Order Of Installation; Wiring The Blower To The Gsr2 Ifc (Bypassing The Rheostat) - Lopi berkshire GS2 Owner's Manual

Hide thumbs Also See for berkshire GS2:
Table of Contents

Advertisement

Optional Equipment
54
13. Wire the accent light for remote operation.
When using the GreenSmart™ 2 remote, the power for the accent light(s) will be routed through the
fuse and IFC, bypassing the rheostat.

Order of Installation

Connect the wiring with the IFC removed as shown below. Attach the power input to the IFC after the
IFC is placed in location (see "a" below).

Wiring the Blower to the GSR2 IFC (Bypassing the Rheostat)

Disconnect the accent light power input (see "a" below).Disconnect the two wires leading to the rheostat
and attach them together (see "b" below). Remove the rheostat from the control panel (see "c" below).
Attach the accent light power input (see "d") to "LIGHT" lead on the fuse harness (pre-connected to the
IFC). This circuit bypasses the rheostat (this component is not used and may be kept for replacement
part purposes).
14. Place the GSR2 IFC near the appliance.
© Travis Industries
(for qualified installers only)
4141208
100-01399

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents