Ignition; Розжиг - Biasi Nova Parva M90.24A User Manual And Installation Instructions

Hide thumbs Also See for Nova Parva M90.24A:
Table of Contents

Advertisement

Instruction for use
Always ensure that the pressure gauge is set
at the required pressure.

2.3 Ignition

1.
Check that the taps located in the lower
part of the boiler are open (Fig. 2.3).
2.
Turn on the electricity supply to the
boiler, switching on the fused spur
isolation
switch.
operation light 9 (Fig. 1.3) will flash
every 4 seconds (stand-by condition).
3.
If the boiler is to be used for c.h. and
d.h.w position the function selector 7 as
in Fig. 2.4. The appliance operation
light 9 will flash every 2 seconds
(operating boiler).
9
4.
If d.h.w. supply only is required,
position the function switch 7 as in Fig.
2.5. The appliance operation light 9 will
flash
every
boiler).
6
The
appliance
7
Fig. 2.4
2
seconds
(operating
Следует
показания манометра
2.3 Розжиг
1.
Проверьте,
расположенные
котла были открыты (Рис. 2.3.)
Open position
Положение «открыто»
Fig. 2.3
2.
Включите
Индикатор котла 9 (рис.1.3.) будет
моргать
(состояние ожидания)
3.
Если
режиме отопления и приготовления
горячей
должен находиться в положении как
указано на рис. 2.4. Индикатор котла
9 будет мигать каждые 2 секунды
(котел работает).
9
4.
Если
приготовление
положение переключателя 7 должно
быть
индикатор 9 будет моргать каждые 2
секунды (котел работает).
периодически
чтобы
в
нижней
электропитание
каждые
4
котел
должен
работать
воды,
переключатель
7
Fig. 2.5
требуется
горячей
как
на
рис.2.5.
проверять
краны,
части
котла.
секунды
в
7
только
воды
Световой

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nova parva m90.28a

Table of Contents