Blower Installation; Night Light - Napoleon Vittoria GD19N Installation And Operation Instructions Manual

Vented natural & propane gas fireplace
Table of Contents

Advertisement

ELECTRICAL INSTALLATION TO BE DONE BY A QUALIFIED INSTALLER and must be connected and grounded in
accordance with local codes. In the absence of local codes, use the current CSA C22.1
current ANSI/NFPA 70
NATIONAL ELECTRICAL CODE
If an optional blower is to be used, the blower must be connected to the main power supply. Route a grounded 14 gauge 2-
wire power cable to the junction box and ground. At the point where the cable enters the junction box, a conduit connector
must be provided.
1. Remove the two
screws that secure
the control panel to the
front of the unit.
FIGURE 52
GS66 WIRING DIAGRAM
VARIABLE SPEED SWITCH
VARIABLE
SPEED SWITCH
KNOB
RED
BLOWER
FIGURE 53
2. Connect the black and red wires of the wire harness to the
prongs on the blower.
3. Connect the white and black wires of the wire harness to the
prongs on the thermodisc.

NIGHT LIGHT

BULB REPLACEMENT
The GD19 comes equipped with our "Night Light™".
If in the event the lamp or lens needs to be replaced, follow
these instructions.
1. Turn off all electrical supply.
2. Remove the front and door from the fi rebox.
3. Unscrew the lens cover making sure the washer stays
in place.
Note: Do not handle the lamp (bulb) with bare fi ngers,
protect with a clean dry cloth.
4. The lamp will pull straight out of the socket. Replace with
Wolf Steel Ltd. parts only (W387-0006), as lamp and
l e n s a r e s p e c i a l " h i g h t e m p e r a t u r e " p r o d u c t s .
5. Replace lens with gasket, lense covers, attach wires to
quick connects and replace the door when fi nished.
THE FIREBOX MUST BE SEALED.
FIGURE 55

BLOWER INSTALLATION

in the United States.
THERMAL DISK
WHITE
BLACK
WHITE
WIRE
HARNESS
(included in GS66 kit)
TO
POWER
SUPPLY
When re-assembling the
light assembly, care must
be taken. "Light Leakage"
from above the cast doors
may be noticed. The holes
in the lamp housing are
necessary for ventilation
and must not be covered.
CANADIAN ELECTRICAL CODE
4. Place the thermal disk
assembly onto the stud
located at the lower left
of the fi rebox and behind
the support bracket.
5. Connect the wiring
for the variable speed
switch.
6.
Insert the blower
assembly into the left
side under the firebox,
slide into the clip and
place onto the same stud
used for the thermal disk
assembly. Secure with
the lock washer and wing
nut supplied. Ensure that
the blower does not touch
the base of the fi rebox, any wiring or
controls. Ensure that the thermodisc is
touching the wall of the fi rebox.
HINT: Rest the thermal disk assembly forward against the
support bracket.
7. Place the variable speed switch into position and secure with
the pal nut supplied. (FIGURE 25) Reinstall the control panel and
install the variable speed switch knob.
NOTE: Plug into the receptacle on the right side of the
unit.
REPLACEMENT
LENS ASSEMBLY INSTALLATION
1. Remove the door from
the fi rebox.
2. Run the wires up through
the lens hole.
3. Align key hole with lens
assembly.
4. Snap into place.
5. Replace light shields,
attach the wires and replace the door to the fi rebox.
LENS ASSEMBLY REPLACEMENT
1. Remove the front door
and top shield from the
fi rebox.
2. Compress the retainer
fi ns in with a screw driver
while pressing fi rmly on the
top of the light assembly.
3. Once all the retainer
fi ns are pushed in the lens
assembly will snap out of
place.
in Canada or the
FIGURE 54
FIGURE 56
KEY HOLE
FIGURE 57
W415-0612 / C / 01.25.08
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vittoria gd19p

Table of Contents