Direct Vent Closet And Alcove Installation - Rinnai Q Premier QP85N Installation & Servicing Instructions Manual

High effi ciency condensing gas boiler
Hide thumbs Also See for Q Premier QP85N:
Table of Contents

Advertisement

12" (300 mm)
12" (300 mm)
minimum
EXHAUST
INTAKE
12" (300 mm)
minimum
Terminal positions PVC
6.7.5
!
WARNING
1"(25mm) minimum clearance
around hot water pipes
2.8" (5x)
70mm
10"
254mm
1"(25mm) minimum clearance
around hot water pipes
2.8" (5x)
70mm
34.6"
880mm
1"
25,4mm
Closet installation
minimum
12" (300 mm)
minimum
12" (300 mm)
minimum
fi gure 22

Direct vent closet and alcove installation

For closet and alcove installation, CPVC material, instead of PVC, must be used
in a closet/alcove structure. Failure to follow this warning could result in fi re,
personal injury, or death.
Rinnai strongly suggests the use of concentric venting for all closet and alcove
installations. For non direct vent room air applications see sections 6.7.6 and
6.7.9.
1"(25mm) minimum clearance
around vent pipe
4.9"
125.8mm
7"
181mm
469mm
14"
349mm
Minimal free vent area
130 square inch
Closed door
Minimal free vent area
130 square inch
0"
0"
fi gure 23a
Fittings or Piping Equivalent PVC
45 degree elbow
90 degree elbow
plastic pipe per foot
concentric vent kit
Equivalent friction loss of PVC/CPVC
1"(25mm) minimum clearance
around hot water pipes
18"
1"(25mm) minimum clearance
around hot water pipes
2.8" (5x)
70mm
34.6"
880mm
Alcove installation
feet
3
6
1
3
1"(25mm) minimum clearance
around vent pipe
4.9"
125.8mm
2.8" (5x)
7"
70mm
181mm
14"
349mm
0"
m
0.91
1.83
0.30
0.91
table 8
18"
469mm
Open front
0"
fi gure 23b
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q premier qp130n

Table of Contents